SITKA GOLD CORP
Yukon, Canada
RC Gold Project: Geological Background
Sitka Gold Corp. (SIG · TSX-V) · Yukon, Canada
Sitka Gold Corp’s Flagship RC Gold Project in the Dawson-Mayo Region of the Tombstone Gold Belt in west-central Yukon…
Share data updated daily
Analysis by Bill Pearson, PhD, P.Geo
Updated Jul 30, 2026
- Sitka Gold Corp’s Flagship RC Gold Project in the Dawson-Mayo Region of the Tombstone Gold Belt in west-central Yukon
- Hosts pit-constrained indicated mineral resources at a cutoff of 0.3 g/tAu of 39.962Mt at 1.01 g/t Au containing 1.291Moz Au in Blackjack
- Total inferred mineral resources of 167.423 Mt at 0.72g/t Au containing 3.829Moz are in three zones: Blackjack, Rhosgobel and Eiger.
- Gold mineralization is predominantly associated with quartz veining occurring within mid-Cretaceous intrusive stocks & adjacent intruded sediments (hornfels), with significant mineralization associated with intense stockwork or sheeted veining
- Typical characteristics of Reduced Intrusive-Related Gold systems(RIRGS).
Figure 1
Source: Sitka Gold
![]()
NEWS RELEASES
Click any release to read Bill's geological analysis:
Actual holdings will vary for each client or fund and there is no guarantee that a particular account will hold any or all of the securities discussed. All investing involves risk including risk of loss. Crescat target resource estimates (TSE) are based on internal modeling and geologic estimates, and include various assumptions based on analysis of geology, geophysics, geochemistry, historic drill assays, and metallurgical recovery data received to date. TSE are discounted based on drilling progress to date, an assessment of the management and technical team's strengths and weaknesses affecting their ability to advance the project, and environmental, local community, and government permitting risk factors. Estimates are displayed on a gold equivalent basis based on current price-to-gold ratios for silver, copper, and other metals if the primary metal is other than gold. Further drilling, assaying, resource modeling, and engineering studies will be required to determine whether Crescat's TSE can be reasonably expected to be achieved. Crescat's target resource estimates are updated monthly across the entire portfolio. Sources: Crescat Capital LLC, Bloomberg, Issuer. Expected profitability percentile is based on Crescat's geologic estimates of projected grades, recoveries, capex, and operational costs on the primary project compared to the universe of operating mines. This value does not project overall anticipated company profitability.