FATHOM NICKEL INC
Saskatchewan, Canada
Fathom Nickel: Geological Background
Fathom Nickel Inc. (FNI · CF) · Saskatchewan, Canada
Saskatchewan-focused exploration company targeting magmatic nickel–copper–cobalt sulphide deposits within the highly prospective Trans-Hudson Corridor…
Share data updated daily
Analysis by Bill Pearson, PhD, P.Geo
Updated Jul 30, 2026
- Saskatchewan-focused exploration company targeting magmatic nickel–copper–cobalt sulphide deposits within the highly prospective Trans-Hudson Corridor.
- Portfolio consists of three principal projects totaling more than 120,000 hectares,with exploration focused on building district-scale critical mineral discoveries
- Flagship Gochager Lake project includes the historic Gochager Lake deposit with areported historic “mineral reserve” of 4,262,400 tons grading 0.295% Ni, 0.081% Cu(SMDI #0880)1
- Host gabbro at Gochager Lake extends along strike for approximately 3.5km withinan 8.0 km long soil geochemical anomaly characterized by very anomalous Ni-Co-Cu plus critical pathfinder elements Cr-Mg
- Albert Lake project is host to former Rottenstone Mine with reported past productionfrom 1965 to1969 of 28,724 tons1 grading 3.28% Ni, 1.83% Cu and 9.63 g/tPd+Pt+Au (SMDI#0958)1.
1 Note as there is no technical data available to verify the historic estimates for the Rottenstone Mine & Gochager Lake deposit,Fatham Nickel treats these estimates as Exploration Targets.
Figure 1
Source: Fathom Nickel
![]()
Figure 2
Source: Fathom Nickel
![]()
Figure 3
Source: Fathom Nickel
![]()
NEWS RELEASES
Click any release to read Bill's geological analysis:
Actual holdings will vary for each client or fund and there is no guarantee that a particular account will hold any or all of the securities discussed. All investing involves risk including risk of loss. Crescat target resource estimates (TSE) are based on internal modeling and geologic estimates, and include various assumptions based on analysis of geology, geophysics, geochemistry, historic drill assays, and metallurgical recovery data received to date. TSE are discounted based on drilling progress to date, an assessment of the management and technical team's strengths and weaknesses affecting their ability to advance the project, and environmental, local community, and government permitting risk factors. Estimates are displayed on a gold equivalent basis based on current price-to-gold ratios for silver, copper, and other metals if the primary metal is other than gold. Further drilling, assaying, resource modeling, and engineering studies will be required to determine whether Crescat's TSE can be reasonably expected to be achieved. Crescat's target resource estimates are updated monthly across the entire portfolio. Sources: Crescat Capital LLC, Bloomberg, Issuer. Expected profitability percentile is based on Crescat's geologic estimates of projected grades, recoveries, capex, and operational costs on the primary project compared to the universe of operating mines. This value does not project overall anticipated company profitability.