The Company notes that: “Some early 2026 holes seem to have defined the limits for individual hydrothermal breccia bodies. Accordingly, future 2026 holes are being designed to offset from known mineralization.”

View Full Release >>

Beyond the Headline

In this release, Norsemont reports nine (9) additional drill holes (MV26-DD-08 to MV26DD-17) totaling 2,187 meters have been completed so far in 2026 with two (2) holes in progress (MV-26-DD-15 and MV26-DD-18) (Figure 1).  These holes are testing targets in five key zones at Choquelimpie to define the full extent of several hydrothermal breccia bodies.  The two holes in progress are offsetting from known mineralization, targeting extensions in the Choque and Suri Zones. Assay results on all holes noted above and the last two MV-25 holes are pending.  The Company notes that: “Some early 2026 holes seem to have defined the limits for individual hydrothermal breccia bodies. Accordingly, future 2026 holes are being designed to offset from known mineralization.”

Figure 1
Source: Norsemont Mining

Location of drill holes on Choquelimpie project (Norsemont Mining Press Release July 2, 2026).