ELO - TO

ELORO RESOURCES LTD

Iska Iska Silver-Tin Project - Potosi Department, Bolivia

40,000m drill program announced at Iska Iska. Major Drilling Group mobilizing 2 diamond rigs, third expected within 3 months. Step-out drilling targets higher-grade core of potential starter pit and down-dip extension of 1.4km mineralized envelope.

View Full Release >>

Beyond the Headline

  • Targeted step-out drilling with 50m spacing within the higher-grade core area of the potential starter pit area to expand the initial indicated resource further.
  • Testing potential down-dip and strike length of known higher-grade Ag-Sn-polymetallic shoots which remain open laterally and vertically.
  • Follow up on successful 2024-2025 step-out drilling that extended the mineralized envelope down-dip and along a strike length of approximately 1.4 km.
  • Major Drilling Group International Inc. is in the process of mobilizing two diamond drill rigs to Iska Iska, with a third drill expected to be added in the next three months.

Iska Iska Planned Drilling Program
Source: Eloro Resources